JHB01 DATA CENTRE [ABC] [47MW]

Southern Industrial & Logistics Clusters (SILC), Johor, Malaysia

A 47MW sprawling data centre in the established industrial zone. The single-storey buildings are designed to be constructed in precast concrete and steelwork for speed, efficiency, economy and safety in construction. 

Critical to the delivery of the facility is the precast nature of the structural material, enabling off-site mobilisation and fabrication: - 


• Precast pretensioned spun pile foundations, facilitating clean and safe groundworks  
• Cantilever precast columns enabling independent, stable, unpropped construction 
• Precast prestressed hollow-core slabs and precast prestressed solid planks, enabling a clean, safe, offsite fabricated and lifted into place floor plate construction 
• Steel trusses, enabling a clean, safe, offsite fabricated and lifted into place roof construction 
• Steel beams, enabling a clean, safe, offsite fabricated and lifted into place owner supplied equipment (generator, power-train-units, IEC) support framework 

Client: Confidential

Consultancy Scope: Full Structural, Civil and Geotechnical Engineering

Project Cost: Confidential

Project Status: Completed in 2024